What a pressurisation unit service covers
We verify the cold fill pressure against the system static height, confirm the low and high alarm set points are sensible for that fill pressure, and function test both alarms rather than assuming they work. Each pump is run and its operation proven, twin units are changed over, the break tank float valve and level switch are tested, and the strainer and non-return valves are checked. Every reading goes on the record so next year's figures can be compared against this year's.
- Cold fill pressure checked against static height
- Alarm set points verified and function tested
- Pumps run individually, changeover proven on twin units
- Break tank float valve and level switch tested
- Strainers and non-return valves inspected
- All readings recorded for year-on-year comparison




